![]() Concrete barrier lumenrt template manual#Part of what speeds up the process is the extensive library of parts that exist in Tekla and that also supports manual additions. Concrete barrier lumenrt template software#“If we had used ordinary CAD software to create the models, it would have taken us three times longer,” Madam Tan claims. TTJ took about six weeks to model each tree with Tekla. It is able to handle changes on the fly, for example, so that any amends proposed by the architect to the original drawing are automatically reflected in the general arrangement drawing. Steel fabrication benefits According to Madam Tan, Tekla has numerous attributes that make it ideal for steel fabricators in particular, it speeds up the fabrication process. As a result, only 920 tons of steel was used to build the soaring Supertrees. To reduce the weight of the overall structure, the steel used in this canopy is very thin, just 3.2mm thick in parts. The cable ensures that the branches do not start sagging and put undue stress on the entire canopy. The interlocking branches at the crown of each tree reveal a delicate network of steel tubes encircled by a stainless steel cable that pulls the structure together. Tekla BIM software was especially useful on this project because of the complex geometries involved in constructing the canopy. This is because the other software products used by TTJ have difficulty in handling curved shapes. ![]() “Any time you have curved parts, it is good to use Tekla,” says Madam Tan Yumin, engineering manager at TTJ. Working with the design drawings for construction, TTJ began by using Tekla Structures to create the general arrangement drawings, together with connection details, before sending the drawings to all relevant parties for approval. TTJ worked closely with the architects and structural construction consultants to fabricate the parts needed for the Supertrees. Having used Tekla Structures for over ten years, the software is key to TTJ’s operations and the firm relies on it for intricate designs and highly complex jobs like this one. As the complex design geometries were vast, Singaporebased TTJ Design and Engineering turned to Tekla BIM software for the entire project. To add to the complexity, a 128m long suspension bridge, the OCBC Skyway, links two of the taller trees together and allows visitors to soak in the view from 22m above ground level.Ĭritical component Steel was a critical component for the entire project, from the frames around each trunk to the network of branches that form the canopy. The trunks of the Supertrees are similarly clad in a steel frame and draped with many types of climbers, flowers and ferns. Some of them also integrate solar cells that generate power for use in the conservatories below. These ‘Supertrees’ consist of concrete trunks, topped by a canopy made of complex steel tubes that form the branches. One of the park’s highlights, however, is mineral rather than vegetable in nature: 18 giant steel and concrete trees, each between 25m and 50m high. The park houses conservatories that showcase plants native to more temperate climates as well as themed gardens that explore the different cultural traditions of Singapore. The park consists of three waterfront gardens: Bay South Garden, Bay East Garden and Bay Central Garden. Gardens by the Bay is a nature park spanning 101 hectares (250 acres) of reclaimed land in central Singapore, adjacent to the Marina Reservoir. For information about the types of concrete blocks we have available for hire and purchase, see below.‘‘ If we had used ordinary CAD software to create the models, it would have taken us three times longer Madam Tan Yumin, engineering manager ’’ Our teams also deal with security, providing blocks to reduce the access opportunities for travelers, squatters, fly tippers and thieves. Providing a barrier between personnel, vehicles, equipment and other hazards (TVCBs).Limiting access or protecting landscaping whilst maintaining an attractive appearance ( Rock).Keep structures securely attached to the ground with Kentledge or ballast to ( Marquee Blocks).Preventing vehicle access Rock, TVCBs, Jersey Barriers, Marquee Blocks).Crowd and traffic management at temporary events (Interlocking Jersey Barriers).Managing traffic flow in open spaces ( Temporary vertical concrete barriers, Jersey Barriers). ![]() Defining entry and exit points to construction sites (TVCBs or Interlocking Jersey Barriers).The wide variety shapes, sizes, and weights mean that clients can find practical barrier solutions that meet their needs, such as including interlocking units for stacking or connecting into chains. Our barriers can be used in numerous commercial or industrial applications, from roadside traffic management to building site security. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |